Facilities :

PASONANCA HOUSE

The Pasonanca House (formerly Phase II Staff House) guest house was constructed by the Engineering Department in 1990. It was purposely built as an office and sleeping quarters for the resident engineers during the construction of the Phase II of the Water Treatment Plant. It has a living room, dining area, toilet and bath, and continue reading : PASONANCA HOUSE

Facilities :

COCO PAVILION, PASONANCA

The Coco Pavilion is situated beside the old reservoir. It has an open and covered space which is used for multi-purpose activities. The office of the Planning and Design Division occupies the office beside the Coco Pavilion.

Facilities :

TEODORO C. ARANETA TRAINING CENTER (RTC)

The Regional Training Center was established in 1977 thru the assistance of the Local Water Utilities Administration. Most trainings programs and other capability building activities like seminars, including meetings were undertaken at the RTC. The amphitheatre-like training center can accommodate 30 participants. It is managed by a staff who is designated training director. The RTC, continue reading : TEODORO C. ARANETA TRAINING CENTER (RTC)

Facilities :

PRODUCTION WELLS

The ZCWD has 23 production wells(as of October 2015). These are located in the following strategic areas within the city: Baliwasan, Gov. Ramos, Putik, Guiwan, Gov. Camins, San Lorenzo Ruiz, Caputatan, Ayala 2, Tulungatung 1, Canelar Moret, Maci-ay, Brillantes, Trumata, Lupong, Pasobolong 1, Pasobolong 2, Divisoria, Lumiyap, Presa Mayor, Cabaluay. Malasaga, Lunzuran, Tulungatung 2  

Facilities :

OLD RESERVOIR, PASONANCA

This asset of the ZCWD is also located at Pasonanca Park, just a few meters away from the treatment plants and beside the Pasonanca natural swimming pool. It has a total capacity of 10,000 cubic meters. Excess water from the diversion weir is conveyed to this facility thru the intake and a transmission line.

Facilities :

SAND AND GRIT REMOVAL BASIN (INTAKE)

This facility supplies water to the old reservoir. Excess water coming from the diversion weir is diverted through the intake. It also serves as removal basin for sand and grit before water is conveyed to the old reservoir via the transmission line.

Facilities :

DIVERSION WEIR

The diversion weir on the Tumaga River is about 4.1 kilometer upstream of the Water Treatment Plant. The dam is made of reinforced concrete construction. It has 18 meters long crest, 3.50 meters toe to crest height. It has an elevation of 74.20 meters above sea level. It’s main purpose is to divert water coming continue reading : DIVERSION WEIR

Facilities :

WATER TREATMENT PLANTS

The Water Treatment Plants are located at the Pasonanca Park in Barangay Pasonanca, Zamboanga City. It is about 6 kilometers away fro m the city proper. The main office of the Operations Group is housed within the area of the treatments plants.   WTP – PHASE I   The Water Treatment Plant – Phase I continue reading : WATER TREATMENT PLANTS