Project Title: Villa San Ignacio Water Distribution Line Replacement and Installation of Flowmeter with Appurtenances, Lunzuran
Approved Budget for the Contract: Php95,878.16
Detailed Description: Supply and Laying of 73 ln.m of 100mm⌀ PVC Pipeline, Supply and Installation of One(1) Assembly of 100mm⌀ Mechanical Flowmeter with Reed Switch with 100mm Basket Strainer, 200mm Check Valve and 100mm Pressure Reducing.
Implementing Office: ZCWD (By Admin)
Detailed Estimates as the Bid Awarded: Php 129,447.18
Responsible Official: Technical Services Group
Scheduled Implementation: September 4, 2024
Completion Date (ref. to Certification): October 17, 2024