P.R. No. 23-0003: Mainline Replacement Program (LGU Funded) Phase II (Negotiated Procurement-Two Failed Biddings Sec. 53.1)

  • Description: Mainline Replacement Program (LGU Funded) Phase II 
  • Mode of Procurement:  Negotiated Procurement-Two Failed Biddings Sec. 53.1
  • Construction Duration: 408 Calendar days
  • Approved  Budget Cost: P 58,689,757.30
  • Date of Negotiations: March 21, 2024 @ 2:00PM at the Board Room, 2nd flr, ZCWD Bldg., Pilar Street, Zamboanga City
  • Date of Bid Opening: April 4, 2024 @ 2:00PM at the Board Room, 2nd flr, ZCWD Bldg., Pilar Street, Zamboanga City
  • Omnibus Sworn Statement – Omnibus-Sworn-StatementRevised-as-of-07.03.2023

 

 

 

Payment for the applicable fee for the Bidding Documents may be deposited in our ZCWD BID DOCUMENTS PAYMENT ACCOUNT:

Bank:  LANDBANK OF THE PHILIPPINES (LBP)

Account Name:  ZAMBOANGA CITY WATER DISTRICT

Account Number:  0191-3826-84

Account Type: SAVINGS

Bank Branch: LBP Main Branch, LANDBANK Building F. Marcos cor. Valderosa Sts., Pettit Barracks, Zamboanga City

Thereafter, send a screenshot or scanned copy of the DEPOSIT/CONFIRMATION SLIP to our email address, bac@zcwd.gov.ph, on or before the deadline for the submission of bids.

 

Please refer to the link below for the scheduled Zoom Meeting (Pre-Bid Conference):

Negotiations under Section 53.1 Two Failed Biddings for PR No. 23-0003 -Mainline Replacement Program (LGU Funded) Phase II
Thursday, March 21 · 2:00 – 4:30pm
Time zone: Asia/Manila

Google Meet joining info
Video call link: https://meet.google.com/hoc-ryjs-dnc

 

Please refer to the link below for the scheduled Zoom Meeting (Bid Opening):

Bid Opening under Section 53.1 Two Failed Biddings for PR No. 23-0003- Mainline Replacement Program (LGU Funded) Phase II
Thursday, April 4 · 2:00 – 3:00pm
Time zone: Asia/Manila

Google Meet joining info
Video call link: https://meet.google.com/xgo-mcqk-gyg