- Description: Design, Build, Testing & Commissioning of the 4,000 cu.m. per day Sewage-Septage Treatment Plant (2nd Bidding)
- Mode of Procurement: Public Bidding
- Construction Duration: 610 Calendar days from receipt of Notice to Proceed (NTP)
- Approved Budget Cost: P 161,200,000.00
- Cost of Bid Document: P 50,000.00
- Date of Pre-Bid: September 20, 2019 @ 9:00AM at the Board Room, 2nd flr, ZCWD Bldg., Pilar Street, Zamboanga City
- Date of Bid Opening: October 2, 2019 @ 9:00AM at the Board Room, 2nd flr, ZCWD Bldg., Pilar Street, Zamboanga City
- PR No. 19-0136 – SSTP (2nd Bidding)
- 1_PDFsam_2nd_Revised Performance Specification_STP (1)
- 130_PDFsam_2nd_Revised Performance Specification_STP(2)
- 139_PDFsam_2nd_Revised Performance Specification_STP (3)
- 148_PDFsam_2nd_Revised Performance Specification_STP (4)
- 161_PDFsam_2nd_Revised Performance Specification_STP (5)
- 168_PDFsam_2nd_Revised Performance Specification_STP (6)
- 174_PDFsam_2nd_Revised Performance Specification_STP (7)
- 180_PDFsam_2nd_Revised Performance Specification_STP (8)
- 191_PDFsam_2nd_Revised Performance Specification_STP (9)
- 199_PDFsam_2nd_Revised Performance Specification_STP (10)